DEFENSE SYSTEM INTEGRATION · CONTROLLED PoC

Prove one state change
through Runtime revalidation and evidence.

The first PoC does not replace C2, Digital Twin or the AI model. It connects one approved T0 state, changes it to T1, measures Runtime revalidation, and returns a review state plus verifiable evidence to the existing human review layer.

Prove Digital Twin state change · T0 → T1 RUNTIME · VERIFIED REPORT · Current-Run SHA-256. These are proposed PoC acceptance tests, not verified field results. Replay and partner integration require independent evidence.
SYSTEM-OF-SYSTEMS POSITION

CREAIM attaches as an independent Runtime Validation & Decision Assurance layer.

EXISTING SYSTEMS
C2 / BMS
Mission · command · asset state
DIGITAL TWIN
Current · simulated world state
WORLD MODEL AI
Predicted future states · branches
ISR / SENSOR
Radar · EO/IR · track/event
AUTONOMOUS
UAV · UGV · USV state
LOGISTICS
Fuel · ammo · sustainment
RULE / POLICY
Mission constraints · authorization
CREAIM RUNTIME
NORMALIZE
RUNTIME STATE
AFFECTED-SCOPE REVALIDATION
RISK / CONSTRAINT REVIEW
EVIDENCE
EXISTING REVIEW UI
VIABLE OPTIONS
Human-review alternatives
PASS / HOLD / STOP
Runtime review state
EVIDENCE
Trace · report · replay
HUMAN DECISION
Final authority remains human
REFERENCE PoC

Start with one representative mission.

A narrow PoC gives both teams a measurable baseline. Current/simulated state and predicted future information may be supplied by the partner; CREAIM revalidates only the agreed information boundary and returns evidence for review.

LAND

Route / asset / constraint review

SEA

Surveillance / response-option review

AIR

Threat / resource-allocation review

JOINT

Multi-domain state review as follow-on

MISSION EVENT
PARTNER STATE
RUNTIME REVALIDATION
RISK ELIMINATION
HUMAN REVIEW
PARTNER / NDA BOUNDARY

Detailed integration material is not published on the public site.

Detailed schema mapping, interface contracts, test vectors, security profiles, implementation limits, conformance details, target measurements and delivery artifacts are released only after approval under the Partner/NDA process. Core implementation, scoring, reduction logic, solver strategy and MetaCore remain CREAIM Internal.

PUBLIC = CAPABILITY + RESULT + EVIDENCE · PARTNER/NDA = APPROVED INTERFACE DETAIL · INTERNAL = CORE IMPLEMENTATION
INVESTOR / PARTNER ACCEPTANCE GATES

Agree the pass criteria before the test.

Proposed gates, not achieved results: (1) approved synthetic/de-identified input and baseline, (2) T0→T1 change trace, (3) per-run Run ID and input/result evidence integrity, (4) fail-closed HOLD on missing or inconsistent evidence, (5) partner-agreed latency and repeatability thresholds, (6) expert review and human authority. Target hardware, real data and live integrations require separate approval and measurement.

PROPOSED ACCEPTANCE · NO FIELD PERFORMANCE OR PARTNER SIGN-OFF CLAIMED
DISCUSS CONTROLLED PoC
PROPOSED T0 → T1 ACCEPTANCE PATH

Prove Digital Twin state change under controlled conditions

T0 → T1 RUNTIME → VERIFIED REPORT. Current-Run SHA-256 and a reproducible replay receipt are proposed acceptance criteria, not claims of live partner delivery, independent Core execution or military field certification.

7-STEP PoC EXECUTION

Proceed from interface agreement to measurement.

01MISSION DEFINITIONDefine one representative mission and success/stop criteria.
02DATA MAPPINGAgree which approved fields cross the adapter boundary.
03ADAPTERMap partner data into the agreed Runtime interface.
04RUNTIME VALIDATIONRevalidate the affected state after an approved change.
05EXPERT REVIEWCompare Runtime review states and evidence with human expert judgment.
06MEASUREMENTMeasure latency, recompute scope, reproducibility and review time.
07TARGET TESTValidate the agreed on-premise, closed-network or edge target.
MINIMUM DATA CONTRACT

Do not begin with all military data.

Initial work can use de-identified, synthetic or specifically authorized test data. The exact partner schema is agreed privately during the PoC design review.

MISSION OBJECTIVE
CURRENT CONDITIONS
AVAILABLE ASSETS
CONSTRAINT SET
STATE CHANGE EVENT
EXPERT REFERENCE
ADAPTER STRATEGY
STEP AFILE / BATCH
REFERENCE
STEP BAPI / SDK
CONTROLLED PoC
STEP CEVENT / STREAM
CONTROLLED PoC
STEP DEDGE ADAPTER
TARGET TEST
ACCEPTANCE METRICS

Judge the PoC with measured evidence.

DECISION LATENCYMEASURE

Input change → Runtime result

RECOMPUTE SCOPEMEASURE

Measure only the affected Runtime scope

CONSTRAINT DETECTIONMEASURE

Detect critical constraint violations

EXPERT AGREEMENTMEASURE

Compare with military expert judgment

REPRODUCIBILITYMEASURE

Replay result for identical approved input

EVIDENCE INTEGRITYMEASURE

Verify result and evidence integrity

DISCONNECTED BEHAVIORMEASURE

Observe controlled behavior during network loss

HUMAN REVIEWMEASURE

Confirm final authority remains human

PUBLIC DELIVERABLE VIEW
INTERFACE MAP
Approved boundary only
T0 → T1 RUNTIME
State change · affected scope
MEASURED BENCHMARK
Partner-defined acceptance metrics
VERIFIED REPORT
Result · evidence · replay
SECURITY PROFILE
Provided under Partner/NDA
DEPLOYMENT PLAN
Provided under Partner/NDA
START WITH ONE MISSION / ONE STATE CHANGE

Connect T0. Change to T1. Measure revalidation. Verify the evidence.